Overview
Project background:
Gorilla has developed significant experience in the design and installation of temporary bridges and towers at live events and festivals, a number of bridges and structures were designed and installed Shambala 2019
Gorilla role summary:
The design, install & removal of 2 bridges, 7 security towers and 5 site structures, including marquee facades and DJ towers.
Gorilla role detail:
- Installation of x2 bridges (1 pedestrian / 1 buggy)
- 4 man team, 1 telehandler.
- CAD drawings / Engineering
Event Work:
Gorilla worked with the site team and organiser to facilitate an efficient build up and de-rig.
Timescales involved:
- 3 day install
- 1 day de-rig
This was Gorilla’s 1st year working with Standon Calling
Result / Outcome:
The client was delighted with the work undertaken, the process ran more smoothly than it had in previous years.
Client Feedback:
“We needed a number of temporary structures to be designed and built around the festival site, primarily two bridges – one for foot traffic and the other capable fo carrying buggies – seven security towers, and other structures including marquee facades and Dj towers. The team from Gorilla worked with us throughout the process to design, install and de-rig them quickly and efficiently, and we were delighted with the result.”
Graham MacVoy, GMC Events